Posted by Shannon | Posted in | Posted on Monday, November 09, 2009
With so much to do before the we turn on the lights, I thought I'd post a little update here, then back to this sequence I'm working on. We finally sat down and finalized the show for this year. There were a few changes, which requires some tweaks to the sequences, namely adding a few additional channels. Until we got the electrical circuits installed, we weren't really were we might use these extra channels, so now we're reworking the songs from last year and adding at least one new song and hopefully a few more to rotate in before Christmas.
This year I've actually gotten involved in doing the sequencing. Last year I helped with the overall design of the light show, then build the website and this blog, leaving all the hardware and other technical details to my partner in crime. This year with so much work to do I thought I'd give it a try. Here's a little snippet of what I'm talking about. It's MUCH harder then I thought.
I just hope we can get all the work done before launch day, which right now we're looking at 11/28 for our first show, so only 19 days to go.
This year I've actually gotten involved in doing the sequencing. Last year I helped with the overall design of the light show, then build the website and this blog, leaving all the hardware and other technical details to my partner in crime. This year with so much work to do I thought I'd give it a try. Here's a little snippet of what I'm talking about. It's MUCH harder then I thought.
I just hope we can get all the work done before launch day, which right now we're looking at 11/28 for our first show, so only 19 days to go.


Comments (0)
Post a Comment